(1) The application shall provide:

(a) Specific locational information including GIS coordinates of all facilities;

(b) Specify whether and where small cell facilities are to be located on existing utility poles including city-owned light standards (included in the definition of utility pole); or

(c) Whether and where small cell facilities are to utilize replacement utility poles, new poles, towers, and/or other structures.

(2) Conduit and/or ground-mounted equipment necessary for and intended for use in the deployment shall also be specified regardless of whether the additional facilities are to be constructed by the applicant or leased from an infrastructure provider.

(3) Detailed schematics and visual renderings of the facilities shall be provided by the applicant.

(4) Failure to provide sufficient detail may result in a later finding of a significant change in the facility if significant elements of the facility were not shown on the originally approved franchise exhibit. Failure to include significant elements may also result in the requirement that new or undocumented elements complete the approval processes detailed in this chapter and in other applicable provisions of Stanwood Municipal Code. (Ord. 1469 § 6 (Att. E), 2019).