Upon completion of the work, the civil engineer shall submit as-built drawings and a report to the city certifying that the completed project conforms to the conditions of the permit and the approved plans, and that all grading work, drainage facilities, erosion control measures, etc., have been completed in accordance with the issued permit. Minor deviations from the approved plans shall be listed in the report or noted on reproducible as-built drawings, which must be submitted with the report. (Ord. 1499 § 10 (Exh. H), 2021).